Yes, for estimates and schedules the contractor produced, subject to owner contract terms and subcontractor confidentiality. One buyer listing names schedules and estimates as a nice-to-have beside project records. The pair that carries value is the estimate and what the job really cost. Lost bids are useful when the result is recorded. Subcontractor names come out, and recent pricing that could identify a competitor is the part to handle with most care.
- An estimate linked to actual cost is the unit. Either half alone is weak.
- Lost bids count when the outcome and the spread are recorded.
- Subcontractor quotes are the subcontractor's pricing. Mask names and check your terms.
- Public bid totals are already published. Your internal build-up is not.
Can a contractor license past estimates and bid history?
Yes. An estimate is the contractor's own work product, and nothing in general law stops the contractor licensing it. The limits come from owner contracts, subcontractor confidentiality and, for public work, procurement rules.
A public listing for construction companies (one buyer's public listing, read 15 November 2026) asks for "Records from completed projects: drawings, specs, RFIs, submittals, change orders and daily logs" and lists "Schedules and estimates" among the items that are nice to have. The systems it names include Bluebeam and Primavera P6. One of its scoping questions is "Do any owner contracts restrict project data?"
Estimates are an addition to a project archive in that listing, not the headline. No public listing read that day names estimates or bid history as its own category.
Estimate plus actual cost: the pair buyers want
An estimate is a prediction. It becomes training material when the answer is attached. Contractors hold five record types that can be joined on a job number and a cost code.
| Record | What it holds | What it pairs with |
|---|---|---|
| Takeoff | Quantities by drawing sheet and assembly, with the marked-up drawings | Installed quantities from the cost report |
| Estimate | Line items with labour hours, crew, production rates, material and equipment prices, markup | Job cost report by the same cost codes |
| Bid day record | Subcontractor quotes received, scope gaps, the final number, time of the last change | Bid result: won or lost, the low bid, the spread |
| Schedule | Baseline activities, logic, durations and resources | Updates and the as-built schedule |
| Change orders | Scope change, priced and negotiated | What was approved and what it cost |
Change orders, RFIs and submittals are covered in the construction project records guide.
Are lost bids useful?
Yes, when the result is recorded. A lost bid with the winning number and the spread shows where an estimate was high. A lost bid with no outcome is half a record.
Public owners publish results, so the totals are often easy to recover. California's transport department holds "Public bid openings for competitive solicitations" and says "Results are posted within 24 hours of the bid opening" (Caltrans). That also sets the limit on value: bid totals for public work are already public. What only the contractor holds is the build-up behind its own number.
Keep estimates that were never submitted too, with the reason. A decision not to bid is a judgement about risk, and it is recorded nowhere else.
Do subcontractor quotes have to be removed?
The names usually do. A quote is the subcontractor's own pricing, often sent in confidence, so remove the firm name and anything that identifies it. Whether the numbers can stay depends on your subcontract and bid terms and on how recent they are.
Pricing can be a trade secret. The federal definition covers "all forms and types of financial, business, scientific, technical, economic, or engineering information" where the owner "has taken reasonable measures to keep such information secret" (18 U.S.C. 1839). A subcontractor who marks a quote confidential has a claim to that protection.
Competition law is a reason for care with current prices. The Sherman Act declares illegal "Every contract, combination in the form of trust or otherwise, or conspiracy, in restraint of trade or commerce" (15 U.S.C. 1). Licensing old records to a model developer is not an agreement between competitors. Even so, recent, identifiable prices from named firms in one market are the last thing to put in a dataset. Aged data with firm names removed is the cautious form.
Federal work adds its own terms. The procurement statute defines "contractor bid or proposal information" as cost, pricing and similar information submitted with a bid "if that information previously has not been made available to the public or disclosed publicly" (41 U.S.C. 2101), and access to the government's own estimate "shall be limited to Government personnel whose official duties require knowledge of the estimate" (48 CFR 36.203). Keep anything received from an agency out of the set. This page is general information, not legal advice.
Who owns the construction schedule file?
The party that built it, in most cases the contractor or its scheduling consultant. The owner contract often requires the schedule to be submitted and may give the owner rights in the submitted file. Read the scheduling specification and the documents clause before listing schedules.
A schedule submitted to an owner is a deliverable. The working file, with its internal float, risk allowances and what-if versions, usually is not. If a consultant built the schedule, check who owns it under that agreement.
The native file carries the value. Oracle describes XER as the "Oracle Primavera Proprietary Exchange Format (XER)" used to move project data between its products (Oracle). An XER or XML export keeps activities, logic, calendars and resources. A PDF of a bar chart keeps none of the logic.
What format do buyers want for estimates and schedules?
No public listing gives a format list. Deliver the native file and a plain export beside it, keep line items as rows, and keep the cost codes that join the estimate to the cost report.
For schedules, export from the scheduling tool. Oracle's own steps for P6 Professional are "Choose File, Export" and then "Choose Primavera PM - (XER)" (Oracle P6 documentation). Export each baseline and each update, not only the final version.
- Estimates: the estimating database or workbook, plus a spreadsheet export with one row per line item.
- Cost codes and the work breakdown structure used, with their descriptions.
- Takeoffs: the quantity export and the marked-up drawing set it came from.
- Markups: the markup summary exported as a table, linked to sheet numbers.
- Schedules: XER or XML for every baseline and update.
- Job cost reports by the same cost codes, at closeout.
- A project index: type, size, region, delivery method, year, won or lost.
Owner contract terms on project records
Three clauses in the prime contract decide what a contractor may do with its own records. A confidentiality clause may cover project information in general. A documents clause may give the owner rights in drawings, models and submitted schedules. A publicity clause may bar any mention of the project.
None of these usually reaches the contractor's internal estimate, which the owner never saw. They often do reach anything that reveals the owner, the site or the design. That is why estimates are licensed with project names, addresses and owner names replaced by a type, a size band and a region.
Insurance repair estimates raise different questions, covered in the Xactimate estimate guide.
Example: one bid, estimate linked to actual cost
A fictional mechanical contractor assembles one job it won in 2019: a school HVAC replacement.
| Piece | Record | Kept or changed |
|---|---|---|
| Takeoff | Duct, pipe and equipment quantities by sheet | Kept; sheet titles with the school name replaced |
| Estimate | 412 line items with hours, rates and material prices | Kept; supplier names removed |
| Quotes | Three controls quotes and two insulation quotes | Firm names replaced with Sub A to Sub E; scope notes kept |
| Bid day | Final number, two late changes with reasons | Kept |
| Result | Won; second bidder 3.1 percent higher | Kept, from the public bid tabulation |
| Actual | Job cost report by cost code at closeout | Kept |
| Variance note | Project manager note: ductwork labour over by 18 percent, reason given | Kept; names removed |
Fictional example. The variance note is one paragraph and is the most useful record in the set: it says why the estimate was wrong.
Common mistakes with estimates and bid history
Most of them separate the estimate from its answer.
- Exporting estimates as PDF summaries with the line items gone.
- Offering estimates with no job cost data for the same jobs.
- Throwing out lost bids.
- Leaving subcontractor and supplier names in quotes and notes.
- Sending bar-chart PDFs in place of native schedule files.
- Including current-year pricing from named firms.
- Renumbering cost codes between estimate and cost report so the two no longer join.
Estimate and bid history as a data asset
One published company range applies to the wider archive (one buyer's public listings, read 15 November 2026). The listing for construction companies runs from $115,000 to $1 million and says the figure "Depends on project count and imagery". Read it as a published ceiling for complete project records with site imagery, not a typical outcome for estimates alone.
Estimates add most when they sit beside the project records for the same jobs. There is no standard timetable. The order is usually the same: a written description of the archive, a small sample, a rights review, agreed terms, then delivery. The rights review sets the pace. The guide for contractors covers the wider archive, and the construction closeout checklist shows how to keep records linked when a job ends. Engineering firms with site investigation records can read the geotechnical reports guide. Origin Data Partners is an independent data partner that helps companies get their data bought. A buyer may pay Origin when a deal closes.
Does your company hold records like these? See what your data is worth.
Common questions
Can a contractor license past estimates to AI companies?
Yes, for estimates the contractor produced, subject to owner contract terms and subcontractor confidentiality. One public listing read on 15 November 2026 names schedules and estimates as a nice-to-have beside completed project records.
Do subcontractor quotes have to be removed before estimates are licensed?
Firm names and identifying details usually do, because a quote is the subcontractor's own pricing. Whether the numbers stay depends on your subcontract and bid terms. Aged pricing with names removed is the cautious form.
Are lost bids useful as AI training data?
Yes, when the outcome is recorded: who won, the low number and the spread. Public owners often post bid results, so the outcome can usually be recovered. A lost bid with no result is half a record.
Who owns the construction schedule file: the contractor or the owner?
Usually the contractor or the consultant who built it. The owner contract may give the owner rights in the submitted schedule. The internal working file, with float and risk allowances, is normally the contractor's.
What format do AI buyers want for takeoffs and schedules?
No public listing gives a format list. Keep native files with a plain export: line items as spreadsheet rows with cost codes, takeoff quantities with the marked-up sheets, and schedules as XER or XML for each baseline and update.
What are construction takeoffs worth to AI companies?
No public price for takeoffs alone was found. They add value to a project archive when quantities can be compared with installed quantities from the cost report. A takeoff with no actuals is a weak record.
Sources and further reading
- 18 U.S.C. 1839: definitions (trade secret)
- 15 U.S.C. 1: trusts in restraint of trade illegal
- 41 U.S.C. 2101: definitions (contractor bid or proposal information)
- 48 CFR 36.203: government estimate of construction costs
- Caltrans: bid results
- Oracle Primavera Cloud: import and export to P6 overview (XER)
- Oracle Primavera P6 Professional: export projects to an XER file