Know a company with years of records? Refer it and earn up to $100K
A FREE TOOL FOR CONTRACTORS

What are my construction project records worth?

Models that plan and run jobs learn from finished projects: RFIs, submittals, change orders, daily reports and closeout sets. Contractors license them to AI companies. Tell us how many projects are complete, what sits beside them, your crew size and who owns the files. The result shows the top of the company payout range buyers publish, then the highest published listing for construction companies of your size.

Six questionsNo files or system accessSourced and dated
Start the calculator
QUESTION 1 OF 60%

What kind of company keeps these records?

Each industry has its own published listings.

HOW THE ESTIMATE WORKS

Built from what AI data buyers publish.

Answers are saved before the result shows. Under 30 staff it lists the minimums and listings that apply, not a range.

For project records, a construction company listing can apply, with a size band in employees. A buyer's own case study also reports a perpetual exclusive license from a general contractor.

Sources

Every published figure, side by side: the AI training data price index.

Get my valuation
WHAT DRIVES VALUE

What makes a contractor's project records valuable?

A buyer values a project by how completely its paper trail survives. The strongest sets run from bid and contract through submittals, RFIs, change orders and daily logs to punch lists and closeout, with each document dated and filed under its project. A model trained on that sequence can see why a schedule slipped or a cost grew.

Breadth adds weight: many projects of different types, sizes and building systems, over ten years or more, show more than a run of near-identical jobs. Records that carry outcomes are the most useful, such as the final cost against the estimate, the approved change order against the request, and the warranty claim that came back a year after handover.

Which published figures feed the result

For construction and engineering firms, the "Up to" line is the top of the company ranges Mode, micro1 and Handshake AI publish for your size and years in business. The listing line under it is Mercor's Construction Company listing, which counts only when your headcount sits inside its employee band. Polyshares's own case study of a general contractor is a reported payment, so it appears in the sources and never in the result.

Checks on the project files before licensing

Read the guide to selling construction project records

QUESTIONS

Questions about project records.

Which construction records are worth the most?

Complete projects, start to closeout. A set that ties each RFI and change order to its cost, schedule and final result shows how the job really ran. Drawings alone, or a single project, carry much less weight.

Do I need permission from the owner or the subcontractors?

Sometimes. Contracts can give the project owner rights in drawings and reports, and some files belong to the architect or a subcontractor. Origin reads the contracts with you and leaves out what is not yours. This is general information, not legal advice.

Which systems do contractors export from?

Usually Procore, Autodesk Construction Cloud, a document server or email archives, plus the accounting system for job costs. Origin maps what each project folder holds before anything is exported, so you only prepare projects a buyer wants.

What do AI data buyers publish for project records?

Mercor: Construction Company listing (50–2,000 employees), read 20 November 2026. Polyshares (its own case studies): General contractor, perpetual exclusive license (no size stated), read 20 November 2026. A listing counts only inside its terms.

Which records count beside your project records?

Here: jobs and field operations, bim and revit models, cad, drawings or specs, accounting or erp, cameras and video and email and team chat. None of them moves the published figures.

Other value calculators.

Get my valuation