Know a company with years of records? Refer it and earn up to $100K
Quality reference

PPAP in Manufacturing: 18 Elements, Levels and the PSW

What PPAP is in manufacturing: the 18 elements, submission levels 1 to 5, the Part Submission Warrant, how it fits APQP, and DFMEA vs PFMEA.

Elements in a PPAP package
18Design record to warrant
Submission levels
5Level 3 is the common default
Who publishes the manual
AIAGOne of the Quality Core Tools
Needed at every level
Part Submission Warrant
Digital calipers on a quality inspection report on a factory workbench
Short answer

PPAP in manufacturing is the Production Part Approval Process: the package of evidence a supplier gives its customer to show it understands the design record and that its process can make conforming parts at the quoted production rate. The package has 18 elements, the customer picks a submission level from 1 to 5, and a signed Part Submission Warrant (PSW) summarises it.

  • PPAP is proof, not planning: it shows the real process made good parts in a real production run.
  • The submission level decides what you send, not what you must have on file.
  • A warrant (PSW) is needed at every level; Level 3 is the usual default.
  • DFMEA covers the design, PFMEA covers the process, and the control plan turns both into shop-floor checks.

What is PPAP in manufacturing?

PPAP stands for Production Part Approval Process. AIAG, the automotive industry group that publishes the manual, calls it "the industry standard for defining the production part approval process to ensure engineering design record and specification requirements are consistently met" (AIAG). In practice it is a file of documents, measurements and sample parts that a supplier assembles before it ships production quantities. One Tier 1 supplier's guide describes it as evidence that the customer's requirements "are properly understood by the supplier" and that the process can meet them "during an actual production run at the quoted production rate" (Tenneco supplier guidelines).

PPAP started in automotive. A tier 1 automotive supplier sells parts or systems straight to the vehicle maker, and it asks the same of its own tier 2 and tier 3 suppliers, so the requirement runs down the chain. It sits beside IATF 16949, the automotive quality management standard from the International Automotive Task Force, whose first automotive standard was written "with the aim of harmonizing the different assessment and certification systems worldwide" in the automotive supply chain (IATF). AIAG says the Quality Core Tools, of which PPAP is one, "proved so useful that they were adopted by other manufacturing sectors, including aerospace, defense, medical, and pharmaceutical" (AIAG).

A customer usually asks for a PPAP when something changes. The same supplier guide lists a new part or tool, an engineering change, a tooling transfer or refurbishment, a material change, a change of sub-supplier, a process change and a move to another plant (Tenneco). Vehicle makers add their own rules on top: the IATF site lists each maker's customer-specific requirements, including a Ford document written for PPAP alone (IATF).

What are the 18 elements of PPAP?

Supplier guides list the same 18 elements, in the same order, because they follow the AIAG manual (Tenneco; Prestolite). The descriptions below are ours. The requirements for each element are in the manual and in your customer's own rules.

No.ElementWhat it shows
1Design recordsThe drawing and specifications you built to, with every dimension and note numbered (a "ballooned" drawing)
2Engineering change documentsApproved changes that are in the part but not yet on the drawing
3Customer engineering approvalSign-off from the customer's engineers, where the customer asks for it
4Design FMEADesign risks and what was done about them; needed when the supplier designs the part
5Process flow diagramEvery step from receiving to shipping, in order
6Process FMEAWhat can go wrong at each process step and how it is prevented or caught
7Control planThe checks, gauges, frequencies and reactions used in production
8Measurement system analysisStudies such as gauge R&R showing the gauges can be trusted
9Dimensional resultsMeasured values for each ballooned dimension on sample parts
10Material and performance test resultsTest reports against the material and performance specifications
11Initial process studiesCapability studies on the special characteristics
12Qualified laboratory documentationProof that the labs that tested the parts are qualified to do so
13Appearance approval reportApproval of colour, grain and finish, for parts where appearance matters
14Sample production partsParts from the production run
15Master sampleA signed-off part kept as the reference
16Checking aidsFixtures and gauges made for the part, with their own verification
17Customer-specific requirementsRecords showing the customer's extra requirements were met
18Part Submission Warrant (PSW)The signed summary of the whole submission

What are PPAP submission levels 1 to 5?

The level sets how much of the package goes to the customer. It does not change what you must have. One guide says the levels "differ only on the document Submission vs Retention", and it expects suppliers to keep everything current to Level 3 and produce it on request (Tenneco). Another says the levels "determine which of the 18 elements are required at the time of submission", with Level 3 as its default (Prestolite).

LevelWhat goes to the customerWhere one supplier guide applies it
1The warrant only, plus an appearance approval report for appearance itemsCatalogue or commodity parts; re-certifying parts approved before
2The warrant with sample parts and limited supporting dataSimple material or revision changes
3The warrant with sample parts and complete supporting dataNew parts and changes that affect form, fit or function; the usual default
4The warrant and whatever else the customer definesSpecial cases agreed with the customer in advance
5The warrant with sample parts and complete data, reviewed at the supplier's plantOn-site reviews

The typical uses in the last column come from one supplier handbook (Prestolite). Your customer decides the level for each submission.

What is a Part Submission Warrant, and what does PPAP approval mean?

The Part Submission Warrant is the one-page summary a supplier signs. In one guide's words it is the document "in which the supplier confirms that inspections and tests on production parts show conformance" to the customer's requirements (Tenneco). It carries the part number, the drawing revision, the submission level and the reason for submission, and it is required whatever the level.

PPAP approval is the customer's answer to the warrant. The names differ by customer, but there are usually three outcomes: approved, which permits production shipments; interim approval, which the same guide says "permits the shipment of material for production requirements on a limited time period or quantities" while the supplier corrects open points; and returned or rejected, which means the submission must be corrected and sent again.

A simple PPAP procedure follows from that: confirm the level and the reason with the customer, run production at rate on the real tooling, measure and test parts from that run, complete the 18 elements, sign the warrant, submit, and close out any interim conditions by the agreed date.

How does PPAP fit inside APQP?

APQP is Advanced Product Quality Planning, the planning method a supplier follows from the first quote to the launch of a part. AIAG's current manual "addresses how to improve successful new product launches", and the control plan, once a chapter of the APQP manual, is "now a standalone document" (AIAG). AIAG groups six manuals as the Quality Core Tools: APQP, Control Plan, PPAP, FMEA, measurement systems analysis (MSA) and statistical process control (SPC), and says "most automotive manufacturers and suppliers require use of one or more" of them (AIAG).

The simplest way to hold the two together: APQP is the plan and PPAP is the proof. The design FMEA, process flow, process FMEA and control plan are written during APQP. They then become elements 4 to 7 of the PPAP package, and the measurements and studies in the other elements show that the plan worked on the real line.

DFMEA vs PFMEA: what is the difference?

Both are failure mode and effects analyses. A team lists what could fail, rates each failure for severity, occurrence and detection, and acts on the worst first. They differ in what they examine. One supplier handbook says a design FMEA "shows evidence that potential failure modes and their associated risks have been addressed" through the product design, and a process FMEA shows they "have been assessed at the manufacturing process level" (Prestolite).

QuestionDFMEA (design)PFMEA (process)
What is analysed?The part or system designEach step of the manufacturing process
Typical failureA wall too thin for the loadA hole drilled off position
Who owns it?Whoever is responsible for the designThe plant that makes the part
Is it always in the PPAP?Only when the supplier designs the partYes
What must it match?The drawing and its special characteristicsThe process flow diagram and the control plan

The same handbook says the "primary process steps must match both the Control plan and the Process FMEA". Reviewers check that link first.

Control plan template: what columns does it need?

A control plan lists, step by step, how the process is kept in control. One supplier guide wants controls "clearly defined (what, how, by what, when/how often will be measured and where records will be stored)" and wants the whole process covered, from incoming material to packaging (Tenneco). AIAG now publishes a separate Control Plan manual with "detailed guidance on how to develop control plans" (AIAG). The columns below are a workable starting template drawn from those descriptions; your customer may require its own form.

ColumnWhat to enter
Operation number and nameThe same numbers as the process flow diagram and the PFMEA
Machine, tool or fixtureThe equipment used at that step
CharacteristicThe product dimension or process setting being controlled
Special characteristicThe customer's or your own symbol, if the characteristic is flagged
Specification and toleranceThe value from the drawing or the process sheet
Measurement methodThe gauge or test, which should have a measurement study behind it
Sample size and frequencyHow many parts, and how often
Control methodFor example a control chart, a first-piece check or an error-proofing device
Reaction planWhat the operator does when a check fails
Record locationWhere the results are stored

PPAP example: a Level 3 submission for a stamped bracket

A fictional example shows how the pieces join. A supplier stamps a steel bracket to its customer's drawing, revision C, after a new die is built. The customer asks for Level 3.

ElementWhat this supplier put in the package
Design recordDrawing revision C with 42 ballooned dimensions and notes
Design FMEAA one-page statement that the customer owns the design
Process flow, PFMEA, control planSix operations, numbered 10 to 60 in all three documents
Measurement system analysisGauge R&R on the height gauge and the hole-position fixture
Dimensional resultsAll 42 dimensions measured on 5 parts from a 300-piece run
Material resultsMill certificate for the steel coil and a coating thickness report
Initial process studiesCapability studies on the two special characteristics, hole position and flange height
Sample parts and master sample5 parts sent to the customer, 1 signed and kept
WarrantSigned at Level 3, reason "new tooling"

Fictional data. The customer granted interim approval because one capability study fell short of its target, then full approval after the die was adjusted and the study repeated. The acceptance target itself comes from the customer, not from this page.

Common mistakes in a PPAP submission

Most returned submissions fail on consistency, not on the parts.

  • Operation numbers that differ between the process flow, the PFMEA and the control plan.
  • Balloon numbers on the drawing that do not match the dimensional results sheet.
  • Measuring parts from a prototype run or a different tool instead of the production run.
  • Leaving blanks on the warrant, or quoting the wrong drawing revision or submission level.
  • Listing a gauge on the control plan that has no measurement study.
  • Treating a Level 1 or Level 2 request as permission to skip the other elements. They still have to exist.
  • Copying an old FMEA without revisiting the ratings after a design or process change.

Your PPAP history is also a data asset

Years of PPAP packages join a design to the process that made it, the risks the team saw, the measurements and the customer's decision. That joined record is hard to rebuild from public sources. AI data buyers have asked Origin for the engineering records of automotive and auto-parts teams: native CATIA, NX, Creo or SolidWorks files with feature history, plus STEP, and the PPAP records kept around them. Origin Data Partners is an independent data partner that helps a company find out whether its records fit such a request.

Several things must be checked or removed first. Design records and drawings that belong to your customer are not yours to share, and most supply agreements add confidentiality terms that cover PPAP files. Export-controlled technical data has to come out before anything leaves the company; the ITAR and EAR checklist for CAD data walks through that review. Warrants and reports carry names and signatures, and sub-supplier documents belong to the sub-supplier. This page is general information, not legal advice.

Related guides: licensing manufacturing quality records, the 8D report example, the non-conformance report template, the engineering change order template and licensing CAD and engineering data.

Does your company hold records like these? See what your data is worth.

Common questions

What is PPAP in manufacturing, in simple terms?

It is the Production Part Approval Process: a package of documents, measurements and sample parts that shows a supplier understands the customer's design record and that its production process can make conforming parts at the quoted rate.

What are the 18 elements of a PPAP package?

Design records, engineering change documents, customer engineering approval, design FMEA, process flow diagram, process FMEA, control plan, measurement system analysis, dimensional results, material and performance test results, initial process studies, qualified laboratory documentation, appearance approval report, sample production parts, master sample, checking aids, customer-specific requirements and the Part Submission Warrant.

What is the difference between PPAP Level 1 and Level 3?

At Level 1 the supplier sends only the warrant, with an appearance approval report where one applies. At Level 3 it sends the warrant with sample parts and complete supporting data. The supplier must still hold the full package at either level.

What does PPAP approval status mean: approved, interim or rejected?

Approved permits production shipments. Interim approval permits shipments for a limited time or quantity while open points are corrected. Rejected or returned means the submission does not meet the requirements and must be corrected and sent again. The exact names vary by customer.

What is the difference between APQP and PPAP?

APQP is the planning method used from quote to launch. PPAP is the evidence, gathered from a real production run, that the plan worked. Several APQP outputs, such as the FMEAs and the control plan, become PPAP elements.

What is the difference between DFMEA and PFMEA?

A DFMEA analyses how the design could fail and belongs to whoever is responsible for the design. A PFMEA analyses how each manufacturing step could fail and belongs to the plant. A supplier that does not design the part normally submits only the PFMEA.

Is PPAP only used by tier 1 automotive suppliers?

No. Tier 1 suppliers pass the requirement to their own suppliers, and AIAG says the core tools were adopted by other sectors, including aerospace, defense, medical and pharmaceutical.

Sources and further reading

What is your company’s data worth?

AI companies pay $20K to $5M for company records. Six questions, no files.