# EVT, DVT and PVT (engineering, design and production validation tests)

Canonical: https://origindatapartners.com/glossary/evt-dvt-pvt

Also called: engineering validation test, design validation test, production validation test, NPI build stages.

**Definition.** EVT, DVT and PVT are the three build stages a hardware product passes through before mass production: the engineering validation test proves the design works, the design validation test proves a production-intent design meets every requirement, and the production validation test proves the factory can build it at volume. Each stage leaves test reports and failure records.

## Why it matters when licensing company data

A hardware handbook describes the EVT build as "the first time you combine looks-like and works-like into one form factor". DVT units are built from production processes and hard tooling and go through reliability and certification testing. At PVT, the units are, in the same handbook's words, "intended to be sold to customers, if they pass all of your test stations."

Each stage produces records that show how a design actually behaved: test plans, measured results, failure analysis reports, root causes and the design changes that followed. Those records explain engineering decisions in a way that drawings alone do not.

Test reports often carry fewer rights problems than CAD files, but not none: a customer may own the program, a report can contain controlled technical data, and supplier parts can be named under confidentiality terms.

See [licensing EVT and DVT test reports](https://origindatapartners.com/guides/evt-dvt-test-reports-ai) and [who buys hardware engineering data](https://origindatapartners.com/guides/hardware-engineering-data-ai-buyers).

## Example

A consumer electronics company closing one product line still holds the records from three builds of a smart thermostat: EVT reports with failed drop tests, DVT reliability runs with temperature cycling data, and the PVT yield report from the factory. Each failure has an analysis and the engineering change that fixed it. The company lists these as one record type in its inventory, separate from the CAD.

## Source

- [Instrumental: EVT, DVT and PVT (Build Better handbook)](https://instrumental.com/build-better-handbook/evt-dvt-pvt)
